Services · Kitchen & Bath

Kitchen and bath remodeling, end to end.

Layout design, cabinetry, countertops, plumbing fixtures, lighting, flooring, finishes, and installation — all coordinated under one contract by Crown’s design and installation team.

8-16Week kitchen typical
1Contract, one team
FLLicensed installation
200+Slab samples in showroom
What’s included

Every finish category, coordinated by one team.

A typical kitchen or bath touches 6–10 different trades. Crown collapses that into a single contract with one accountable principal — from design rendering through final punch list.

Design

Layout consultation, design rendering, material selection at the showroom, and finish-tier targeting matched to your budget.

Cabinetry & countertops

Custom or semi-custom cabinetry plus quartz, granite, marble, or quartzite countertops. Sourced through Crown’s vendor network.

Plumbing & fixtures

Faucet, sink, tub, shower, and toilet sourcing through curated brand partnerships. Plumbing rough-in coordinated with licensed trades.

Flooring & tile

Tile, stone, hardwood, or LVP flooring with proper subfloor prep, transitions, and waterproofing where required.

Lighting & electrical

Layered kitchen lighting, vanity lighting, and electrical reconfiguration under permit — coordinated through Crown’s electrical partners.

Installation & closeout

Licensed installation, permit coordination, project management, punch list, and warranty documentation — one team responsible from first day to last.

How a Crown kitchen project runs

From showroom visit to first cooked meal.

01

Showroom consultation (60–90 min)

Walk through cabinet samples, slab options, flooring, fixtures. Designer captures scope, budget tier, and inspiration.

02

Design & proposal (1–3 weeks)

Layout rendering, material selection summary, written proposal with line-item pricing and timeline.

03

Selection & contract (1–2 weeks)

Final cabinet, slab, flooring, and fixture selections. Contract signed, deposit collected, lead-time tracking begins.

04

Build & install (6–12 weeks)

Permit pull, demo, rough-in, cabinet install, countertop template & install, tile, paint, fixtures, lighting, appliance integration.

05

Walkthrough & closeout (1 week)

Punch list, touch-ups, warranty handoff, manufacturer registration, and photographic documentation for your records.

Bath remodels

Powder rooms, primary baths, and en-suite full-bath remodels.

Bath projects share the kitchen process but compress the timeline. A powder-room refresh is typically 2–3 weeks. A full primary-bath remodel with custom tile, glass, and vanity is typically 6–10 weeks.

Custom vanities & storage

Custom vanities, linen towers, medicine cabinets, and built-in storage matched to overall bath design.

Tile & glass

Wall and floor tile, custom shower glass enclosures, niches, benches, and waterproofing detail.

Plumbing fixtures & lighting

Faucets, tubs, showerheads, body sprays, vanity lighting, and decorative fixtures — selected at the showroom.

Book a kitchen or bath consultation.

The first 60–90 minutes at the showroom usually moves a kitchen project further than weeks of online research.